B210 Course Project

359 Words1 Page

ASC to provide interior photos from B210 for guidance. Complete Jeff Huffman/ASC to provide CH2M maximum quantity of double rooms that lodging facility would need. Jessica Palen/ASC to provide quantity of industrial washers and dryers needed if setup to be located in this lodging facility. Count of room reduction to allow for commercial laundry. David Winkler/ASC to provide which floor skybridges will be connected at and height required to move equipment underneath safely.  IT&C Ray Thom/MBI to check on door opening (direction of swing) requirements for communication room for Elisa Pittner/CH2M. Ray Thom/MBI to provide list of communication room assumptions to Paul Sheppard/NSF for review. Briana Ernsting/CH2M to provide height of TV mounting options to Ray Thom/MBI. ASC to confirm if …show more content…

Paul Sheppard/NSF to provide requirements for NSF senior staff lounges that will be different than other common areas. An option for one of the subsequent dorms.  Mechanical David Winkler/ASC to set up meeting with Merrick to give an overview of water re-use plan.  Structural David Winkler/ASC to provide Mark Parent/CH2M the contact for geotechnical work involved in other builds. David Winkler/ASC to provide snow study results to Mark Parent/CH2M. Complete Mark Parent/CH2M to check temperatures to see if cold weather steel is required for climate. No preference if not required.  Civil David Winkler/ASC or Merrick to provide Joe Taylor/CH2M the 0 grade elevation and floor height. David Winkler/ASC to provide snow modeling to determine if any requirement improvements of design need to be made based of off future builds. Complete 

Open Document