Factors affecting project outcomes
Don’t take our word for it - see why 10 million students trust us with their essay needs.
Recommended: Factors affecting project outcomes
4.3.2.4 CHALLENGES RELATED TO THE CONSTRUCTION MISTAKES AND DEFECTIVE WORKS Figure 4.5 Challenges contractor related to the construction mistakes and defective works
Construction mistakes and defective works are the fourth challenges to be considered as main challenges that hinder completion on-time project. There are three aspect of sub - challenges in construction mistakes and defective works that hinder project from completing on time were ranked based on relative important index from the perspective of contractor. Lack of workmanship was ranked in first sub – challenges. Besides that, negligence among parties to complete project on time was ranked in second sub – challenges and the last ranked that is shortcut that take will involves
…show more content…
In addition, lack of high – technology is related the challenges of low productivity and efficiency of equipment which is particularly true due to old model equipment not able to produce high production and frequent equipment breakdown problem.
4.4 STRATEGIES ADOPTED TO ENSURE ON-TIME COMPLETION
The objective of conducting the analysis for this section is to determine the strategy can be adopted to complete project on time that identified from the literature review and the ranking according to their significant influence towards efficiency of strategy. Based on the eight challenges that identify, the observations of nine strategies have been proposed to ensure project complete on time.
4.4.1 DATA COLLECTION
The data collection from thirty one respondents on strategies adopted to ensure project complete on time was shown in the Table
…show more content…
In order to identify the effectiveness of strategy to ensure on – time completion in construction project, there are challenges that hinder project from complete on time were identified and ranked based on the calculation of the relative importance index as shown in Table 4.3.
Referring to Table 4.3 and Figure 4.10, shows site management and supervision, proper planning work, cost management, use proper equipment and machineries and collaborative working in construction has made the top five of effective strategies were ranked by contractors.
The site management and supervision is the most important strategy among the nine strategies. The contractors need to ensure all the parties that involve in the construction project to follow the timetables from starting of work until completion of project in time given. So, it will hinder the project from cost overrun. In addition, the contractors have to appoint Project Manager for supervise the construction quality and standard compliance based client
This paper aimed to assess the project’s positive outcome including, but not limited to the ideal and pre-defined operational demand or the so-called conventional constraint which composed of the scope, schedule, and budget. By simply visiting some of the researched textbooks, articles, journals and literature, it was found out that the project 's success varies depending on who are working on it and how the stakeholders engage in it though it was primarily described based on the triple constraint approach. In fact, during the conduct of the study, several added factors were identified to also affect the project outcome like the
The client will be responsible for hiring design team. The client will appoint a management contractor who acts as an adviser to the team during pre-construction and during construction, the management contractor will be responsible for the construction works. The management contractor will employ subcontractors or work contractors to carry out individual work packages in return for a contract fee. The management contractor will engage in the work on the basis of a contract cost plan prepared by a quantity surveyor,project drawings, and a project specification. ( Building Procurement Method,
Nowadays, completion time in the construction projects is very important. As time, cost and quality together is a primary objective of project management and a standard principle. Thus, time is one of the critical item used to which the success project is judged. The time is of the essence clause is signify the importance of the time in a project. It included in a contract to show that any delay in the performance on work will cause breach of the agreement. This clause is to ensure that the contractor may carry out the work and completed it on the completion time stated.
“Our plans miscarry because they have no aim. When a man does not know what harbor he is making for, no wind is the right wind” a famous quote about our goal by Seneca. It is a metaphor about the achievement goal and objectives by good planning skills. One has to plan for what one wants to achieve and where one wants to go. One of the most important things is to have good planning, before taking any project the first think you should do is to create project plan. Planning can be defined as preparing a sequence of action to achieve specific goals and objectives. According to Kerzner (2009), “project planning is desirable that the project manager is involved from project conception through execution. It must be systematic, flexible to handle, closely disciplined through reviews and control and capable of accepting multi functional inputs (pg. 412)”. The importance of planning a project is to describe the work so that it will be easily identifiable to the project team member.
Time: As everyone says ‘time is money’, any product that can slips away too easily. Every project has a due date for delivery the product. When we reduce the project time, we need to increase its cost or reduce its scope. The project manger has to analyze the every scope of the project. The amount of time is required to complete the
According to Boards of Quantity Surveyors Malaysia (BQSM), currently, there are 345 registered quantity surveyor (QS) consultancy firms in Malaysia (BQSM, 2014). In order to remain competitive in the challenging construction industry, QS firms have to adopt the best strategy that suite them. Without proper planning, insufficient projects and remuneration will bring about bad cash flow and become eliminated eventually. Firm size is definitely affecting the choice of strategy used (Abidin, Nor’aini Yusof, & Adros, 2010). These firms may have different strategic orientation and affects the strategic planning process. Planning process will then bring impacts towards the firm’s decision in policy formulation and management style. Four types of categories are used to differentiate between these firms, which are the “Prospector”, “Defender”, “Analyser” and “Reactor” type. “Prospector” firms tend to be entrepreneurial, innovative and new opportunity oriented while “Defender” firms tend to defend the existing market. “Analyser” firms are the hybrid of “Prospector” and “Defender” types and may have relatively more stable and dynamic environment. The last type is the “Reactor” firm that have short term planning and changes continuously according to the latest needs (Hassan, 2010).
Although all of these project-scheduling techniques are very useful and present the entire data in a very presentable format for the project manager and other stakeholders, it is very critical that these be coupled with the other project management techniques to make it a successful
Project management is said to be completed within time when it completed within the “triple constraints”: cost, time and quality. And in a lot of causes, one them is sacrificed so as to meet the other two. Project managers prioritize which ones are the most important.
The two-month delay is caused by the poor definition of project requirements and technical issues encountered by Tom and his team. In addition, some of the team members have full time jobs during day and only focused on the project for a limited time after work. WLC Ltd. is facing the risk of failing a major project in which they have invested a significant amount of company
Delays on construction projects are a universal phenomenon. They are almost always accompanied by cost and time overruns. Construction project delays have a debilitating effect on parties (owner, contractor, and consultant) to a contract in terms of a growth in adversarial relationships, distrust, litigation, arbitration, cash-flow problems, and a general feeling of apprehension towards each other.
Productivity is the key to the survival and growth of any organisation, industry or nation. Well-known Construction Company like L&T, have reported productivity issues. Some factors constrain the achievement of the set project objectives in the building and construction industry and are responsible for the reported steady decline of the productivity and performance. Thus resulting in time and cost overruns.
This paper explores what it takes to be a construction manager and the responsibilities of being a construction manager and the skills that a construction manager should have. It also explores what good construction managers do to have success on their construction projects and the steps that a construction manager must follow to end a project and meet their deadlines at the same
When planning a new project, how the project will be managed is one of the most important factors. The importance of a managers will determine the success of the project. The success of the project will be determined by how well it is managed. Project management is referred to as the discipline that entails the processes of carefully planning, organizing, controlling, and motivating the organization resources so as to foster and facilitate the achievement of specific established and desired goals and meet the specific criteria of success required in the organization (Larson, 2014). Over the course of this paper I will be discussing and analyzing the importance of project management.
PMBOK guide defines TM as the “Use of available time and your own productivity along with the appropriate planning and management of the project schedule” highlighting the link between Time Management and productivity and its closely knit relationship to scope and cost areas. Max Wideman presents a wider definition for TM as the “function required to maintain appropriate allocation of time to the overall conduct of the project through the successive stages of its natural life-cycle, by means of the processes of time planning, time estimating, time scheduling, and schedule control.” Ultimately at it’s core however, TM is about time, its planning and control during all stages of the project. A further look into Wideman’s definition of TM by means of identifying its importance throughout the entire project life-cycle (Initiation, planning, execution, controlling and close-out) is required. It is hoped that by analysing how TM tools and techniques can positively and negatively effect the different stages of the Project life cycle a better understanding of productivity, TM and project success will result.
Project management involves all activities that encompass scheduling, planning, and controlling projects. A successful project manager ensure that an organization’s resources are being used both efficiently and effectively. Most projects need to be uniquely developed require a sense of customization and the ability to adapt to any posed challenges. The scope of effective project management includes defining what the project is and what is being expected to be accomplished. Projects are imposed to fulfill a certain need and project managers must have the ability to create the proper definition. Goals and the means used to attain those goals have to be clearly stated. Project Managers must also have the ability to plan