Estimator Essays

  • Engineering Cost Analysis

    1512 Words  | 4 Pages

    the survival of any business or organization. Cost estimators develop the cost information that business owners or managers, professional design team members, and construction contractors need to make budgetary and feasibility determinations. From an Owner's perspective the cost estimate may be used to determine the project scope or whether the project should proceed. According to the U.S. Department of Labor there were about 198,000 cost estimators in 1994. That of which 58% work in the construction

  • Foundation Repair

    788 Words  | 2 Pages

    The way a cost of Foundation Repair is determined depends on the amount of damage, underpinning method, material, and number of piers required for proper support and leveling. To get an accurate estimate usually requires a thorough foundation inspection that can last from 30 minutes to several hours depending on the structure. Certain types of soils move foundations. Foundations under homes stress and fatigue over time when the soil composition changes beneath the foundation and causes the home

  • Estimation of Population Parameters

    1465 Words  | 3 Pages

    Estimation of Population Parameters Aim Undertake a small-scale survey to estimate population parameters. Size of Sample The size of the sample must be quite small, because it is stated so in the aim. However, to make accurate estimates of population parameters the sample must be large enough. [IMAGE] According to the Central Limit Theorem: n If the sample size is large enough, the distribution of the sample mean is approximately Normal. n The variance of the distribution

  • Springdale Shopping Survey

    905 Words  | 2 Pages

    In a continuation of the Springdale Shopping District Survey, use of confidence intervals is introduced to improve upon the evaluation of the quality of the statistics derived from the survey of a sample population. There has historically been an assumption that the respondents represent a simple random sample of all potential respondents within the community and that the population is large enough that application of the finite population correction would not make an appreciable difference in the

  • Importance Of Construction Estimator

    948 Words  | 2 Pages

    is about the professional development of the construction estimators. We had discussed about the construction estimators job, what is their education? , what are their skills? , what are their responsibilities? We try to assist the professional development of the construction estimator by competing it with the cost engineer/ engineer and try to have some useful outcome. For that we should have the information about the construction estimator and cost engineer so we interview both of them and gather

  • A World Without Emotions

    723 Words  | 2 Pages

    It is often that people will find themselves in deep distress, wishing that they would not have to feel emotions ever again. With emotions, people can feel anger, hatred, sadness, and fear, however, they can also feel happiness, gratitude, and other positive emotions. Everyone will find themselves in a situation where they have negative emotions, and want emotions to cease to exist, however, would eliminating emotions end up being a wise choice? Having positive emotions can bring much joy to a person

  • Short Analysis: Analysis Of The Kaplan-Meier Analysis

    1163 Words  | 3 Pages

    The Kaplan–Meier estimator is a product limit estimator that is used for estimating the survival function from lifetime data [24]. The aim of this estimator is to estimate a population of patients’ survival curve from a sample. This estimator is used in addition to the Receiver-operator characteristic ROC curve to evaluate the performance of the prediction model [25-27]. Of course, if every patient is followed until death, the curve may be estimated simply by computing the fraction surviving at each

  • BIM Modeling Essay

    576 Words  | 2 Pages

    wall for the gable ends). This kind of deduction will not be possible on the software itself and that is not how the software is designed to work as well. A different manipulation would have to be done in order to get the value of 84.86. Therefore, estimators must adapt their takeoff techniques in order to extract accurate data from the model. This would mean that those performing the takeoff must be trained to use the software. As only trained quantity surveyors can use the software, it limits the population

  • Eyewitness Testimony Research Paper

    988 Words  | 2 Pages

    The accuracy of eye-witness testimony is a prevalent yet controversial topic within the criminology field. Over the last 20 years, scientific psychology and research pertaining to eye-witness testimony has made great advances in discovering the factors that affect witness identification of suspects. It is considered that due to the fact that eye-witness testimony is often believed to be inaccurate, through applying certain recommendations, its accuracy can be enhanced, thus allowing it to become

  • James Ochoa Perpetrator Essay

    1494 Words  | 3 Pages

    Introduction In Buena park, California, at the night of May 22, 2005, a young Hispanic man pointed the gun to two young Hispanic men and took their wallets with $600 and drove off their car (Volkswagen Jetta) away. Two victims reported to police and gave the description of the perpetrator. The police office who took the description from the victim immediately thought of James Ochoa and he showed the picture of James Ochoa to the victims, both of victims said the man in the picture “look like”

  • The Construction Model: Building Information Model In Construction

    622 Words  | 2 Pages

    Report: Evaluating eqBQ 1 INTRODUCTION 1.1 QUANTITY TAKE-OFF IN CONSTRUCTION Quantity takeoff is an essential task in the construction process as it provides the basis for other construction tasks that follows. The building elements are measured and these quantities are then used to estimate the cost and the relevant workload involved. This information is then assembled in a Bill of Quantities (BQ). The BQ structures and organizes the information about measurements, productivities and costs, according

  • Lead And Mortality Summary

    738 Words  | 2 Pages

    lead exposure via water pipes on infant mortality. This paper will examine the internal and external validity of their research. Internal Validity Internal validity has two components. First, the estimator of the causal effect must be unbiased and consistent. Second, the standard errors of the estimator must be appropriate to conduct a hypothesis test. Threats to internal validity include omitted variable bias, functional

  • Dr. Scott Fraser Psychology

    738 Words  | 2 Pages

    briefness can affect the encoding process. Contrary to belief, stressfulness does not necessarily increase or enhance the encoding of an event. The teenagers in the Carrillo case would have most definitely been under tremendous amount of stress. Estimator values such as extreme stress and the weapon focus effect limited the boys' ability to process all the stimuli taking place. Seeing the gun drew their attention away from other aspects of the event, and limited their attention to other pieces of

  • Financial Liberalization Essay

    1434 Words  | 3 Pages

    Impacts of Financial Liberalisation on Economic Growth in SADC Chapter Two (2) 2. Literature review Defining Financial Liberalisation: Financial liberalization is a process whereby restrictions on financial markets and financial institutions are eliminated which involves the removal of controls by the government namely, credit and interest rate controls. In the early 1970’s, the research on financial liberalization was initiated by McKinnon and Shaw (1973) who argued that state control of credit

  • Cost Estimating In Construction

    945 Words  | 2 Pages

    This chapter provides a review on the existing literature regarding uncertainty in cost estimating in construction. There is an examination of the definitions of terms, and a review surrounding the practice and forms of cost estimating. The review will also analyse the factors effecting cost uncertainty and its relative importance to construction projects before focusing on design information as a major proponent of the inherent uncertainty in estimating. Key points have been identified within the

  • Eyewitness Testimony Essay

    1393 Words  | 3 Pages

    Eyewitness testimony is the evidence given in a court or in police investigations by an individual who has witnessed a crime or offense (Loftus, 2003). Eyewitness testimonies rely heavily upon a human’s memory. “Given the complex interaction of perception, memory, judgment, social influence, and communication processes that lead up to an eyewitness’s story of what happened, it should hardly be surprising that such testimony often is a faulty version of the original event (Wells, 1987)." Eyewitness

  • Essay On Construction Management

    1043 Words  | 3 Pages

    site (Training WA career centre, 2011)  Estimators: Compare quotes and break down the entire project into parts in order to forecast approximate costs and budgets (HowDoIBecomeA.co.uk, 2000-2014) and (StudentScholarships.org, 2009-2014)  Contracts Manager: Health and safety concerns are considered their main role as well as managing client expectations and negotiating sub-contracts (CareerStructure.com, 2014)  Planner: Organises the work of the estimators and project manager to develop a project

  • Essay On Feature Selection

    2512 Words  | 6 Pages

    To the programming community the algorithms described in this chapter and their methods are known as feature selection algorithms. This theoretical subject has been examined by researchers for decades and a large number of methods have been proposed. The terms attribute and feature are interchangeable and refer to the predictor values throughout this chapter, and for the remainder of the thesis. In this theoretical way of thinking, dimensionality reduction techniques are typically made up of two

  • Using OLS Linear Regression Analysis Estimates two Models

    1653 Words  | 4 Pages

    a crucial statistics tool to estimate the relationship between variables. Usually, the estimator indicates the causality between one variable and the other (A Sykes, 1993) (e.g the product price and its demand quantity). This report will analyzes the product ‘Supa-clean’, a new cleaning agent in Cleano-max PLC, though two model: a demand function and a multivariate demand function. After analysing the estimator, the weakness and the room of improvement of this statistics tool will be discussed. Ⅱ

  • Bayesian Learning

    1314 Words  | 3 Pages

    BAYESIAN LEARNING Abstract Uncertainty has presented a difficult obstacle in artificial intelligence. Bayesian learning outlines a mathematically solid method for dealing with uncertainty based upon Bayes' Theorem. The theory establishes a means for calculating the probability an event will occur in the future given some evidence based upon prior occurrences of the event and the posterior probability that the evidence will predict the event. Its use in artificial intelligence has been met with