1. Introduction
This memo is a failure analysis report on the Tacoma Narrows bridge. The bridge collapsed on November 7th, 1940 just over four months after it was opened to the public on July 1st, 1940(Green, 2006). The only casualties(good word??) from the bridge collapse were reporter Leonard Coatsworth’s car and dog. The bridge’s design and failure will be discussed, as well as new suspension bridge design methods.
2. Description of Failure
Other similar built bridges such as the Golden Gate Bridge in San Francisco can have vertical oscillations with amplitudes of up to 2 feet and horizontal oscillations up to 6 feet during severe windstorms(Levy, 1992). Due to visible oscillations in other similarly built bridges, oscillations in the Tacoma Narrows bridge were expected. However, the magnitude of the oscillations the bridge experienced and the length of time it took the bridge took to damp them out was of concern to the engineers involved. The length of time Tacoma Narrows Bridge needed to damp out its oscillations was unlike other similarly built suspension bridges, namely the Golden Gate Bridge, whose oscillations were quickly damped due to its larger width-to-span ratio. (need connecting sentence)Just before the total failure of the bridge the oscillations changed from their standard vertical and horizontal to a violent twisting motion, this twisting motion, which reached almost 45°, was what brought the bridge down. After a momentary lull in motion the twisting started up again and the bridge started to break, beginning with smaller suspender cables connecting the bridge deck and the 2 large main support cables. The breaking suspender cables meant that nothing was holding up that part of the bridge deck and it bega...
... middle of paper ...
...en stiffening trusses could have been used instead of solid stiffening girders to allow more air flow and reduced wind resistance(Levy, 1992). Additionally the system should have been damped to ensure that its resonance frequency cannot be duplicated in nature and create a positive feedback loop and to make sure that any oscillations that do occur are quickly slowed.
Works Cited
Farquharson, F. B. (1940). The collapse of the tacoma narrows bridge. The Scientific Monthly, 51(6), 574-578.
Goller, R. R. (1965). The legacy of "galloping gertie". Civil Engineering, 35(10), 50.
Green, D., & Unruh, W. G. (2006). The failure of the tacoma bridge: A physical model.74(8), Retrieved Feburary 23rd, 2010 from http://scitation.aip.org/journals/doc/AJPIAS-ft/vol_74/iss_8/706_1.html.
Levy, M. (1992). Galloping gertie. WHY BUILDINGS FALL DOWN (pp. 109). New York : W.W. Norton.
Steven Hermosillo Professor Wallace Fire Tech 105 15 November 2015 Silver Bridge Collapse According to Wikipedia, Forty-six people were killed in the silver-bridge collapse and another nine people were injured. “The Silver Bridge was an eye-bar-chain suspension bridge built in 1928 and named for the color of its aluminum paint. The bridge connected Point Pleasant, West Virginia, and Gallipolis, Ohio, over the Ohio River” (Wikipedia). This was a highly used bridge serving thousands of cars a day before the collapse.
"An Occurence at Owl Creek Bridge." Classic Reader. 2009. BlackDog Media, Web. 2 Dec 2009. .
An Occurrence at Owl Creek Bridge is split into three sections. In the first section, Bierce describes in detail the situation, a youn...
On May 24, 1854, construction began of the Victoria Bridge. This was a difficult task for the workers given the size of the bridge (“almost two miles in length from shore to shore” ) was the largest construction project during this period of time. Moreover, the construction of the bridge did not cease during the winter months. Therefore, many of the workers on the bridge would continue even while the St-Lawrence River froze underneath their
In the early 1900's, settlers of the San Francisco Bay Area considered the San Francisco-Oakland Bay Bridge, which spans over eight miles long and 500 feet above the water at its highest point, an impossible feat. However, with only a few complications, the bridge was completed by November, 1936. The San Francisco-Oakland Bay Bridge consists of two bridge types. The east section is a cantilever bridge, and the west, a suspension bridge.
OWLCREEK BRIDGE" ." ABP Journal. 1.1 (2005): n. page. Web. 23 Mar. 2014. Bierce, Ambrose “An Occurrence at Owl Creek Bridge”. The Norton Introduction to
According to Suspension bridges: Concepts and various innovative techniques of structural evaluation, “During the past 200 years, suspension bridges have been at the forefront in all aspects of structural engineering” (“Suspension”). This statement shows that suspension bridges have been used for over 200 years, and that people are still using them today because they are structurally better bridges. This paper shows four arguments on the advantages of suspension bridges, and why you should use one when building a bridge. When deciding on building a suspension bridge, it has many advantages such as; its lightness, ability to span over a long distance, easy construction, cost effective, easy to maintain, less risk
Heller, Arnie. "The 1906 San Francisco Earthquake." Science & Technology (2006): 4-12. Web. 8 May 2014.
After the shock of Hurricane Katrina slightly diminished, the Congress ordered a congressional inspection of the federally build levee system. As they dug deeper into the cause of the levee’s failure, they began to discover flaws in the actual engineering of the levees. Three of the levees that had the most prominently negative effect on the city, and ...
The architecture and engineering firm hired with the task of designing and constructing the tower, SOM, assigned Bruce Graham and Fazlur Khan to the project. They implemented a bundled tube design that was the first of its kind on such a large project that paved the way for the design and construction of future skyscrapers. This design allowed for 4.5 million square feet of office space, more customization of the floor layouts, up to 3 foot of sway within the building, and the stiffness needed to stay standing at the height in which it was built. The tubular design also allowed Sears to save about $10,000,000 on steel alone compared to previously used steel frame designs. Additionally, SOM managed to save 95% of the time usually spent welding by using prefabricated parts referred to as Christmas trees. This not only majorly sped up the process, but allowed Sear to save on labor costs. In addition to 3 trussed layers in the building, there were trusses and spandrel beams designed into every floor to help the load distribute more evenly.
Press, A. (2013, December 11). Seattle Deicer Error Made Bridge Roadway Slick. Retrieved January 26, 2014, from My NorthWest: www.mynorthwest.com
From the laws of physics, we know that F = ma and a = F/m. This means that when an external force is applied to a system, such as wind pushing on a skyscraper, there has to be an accleration. Consequently, the people in the skyscraper would feel this acceleration. In order to make the occupants of the building feel more comfortable, tuned mass dampers are placed in structures where the horizontal deflections from the wind's force are felt the greatest, effectively making the building stand relatively still.
In her essay,”Importance of the Golden Gate Bridge,” Stephanie Stiavetti suggest that “It maintained this point of pride for nearly 25 years until the Verrazano- Narrows Bridge was built in New York in 1964. Today, this historic San Francisco landmark holds its place as the second largest suspension bridge in the country, behind Verrazano Narrows.” Back then, experts thought that it would be impossible to build a bridge across the tides and currents in that area because strong currents and tides would make construction extremely difficult and dangerous. The water is over 500 feet deep in the center of the channel, and along with the area's strong winds and thick fog, the idea of building a bridge there seemed nearly impossible. Despite all of the problems of building a bridge across the Golden Gate, Joseph Strauss was named as lead engineer for the project. Construction began January 5, 1933, and in the end cost more than $35 million to
Works Cited Journal articles: • Lane, Thomas. “Crazy Angles, Soaring Steel.” Building vol. 274 no. 8588 (28) 2009, July 17, pp. 40-46.
Johns Hopkins University. (2009, March). In disaster-prone areas, construction needs a new approach. Retrieved from http://phys.org/news157051992.html