Channel Tunnel Research Paper

730 Words2 Pages

The Channel Tunnel (Eurotunnel)
By: Jawad Alibrahim
For: Professor Knutson
Dec 3, 2015 CON 101

Abstract
The Channel Tunnel is an undersea rail tunnel that connects Britain and France. It was conceived as early as 1802, but its construction began in 1986 and ended in 2004. Construction of project used labor from both countries. A total of 15,000 skilled and unskilled laborers worked to complete the project. The Channel consists of two main train tunnels and a third one in the middle used for maintenance and emergency services operations. It connects the town of Coquilles in France to Kent in the Britain.

The Channel Tunnel (Eurotunnel)
The Channel Tunnel (also known as the Eurotunnel) is an underground and …show more content…

The first northbound tunnel carries passengers and cargo from Britain to France while the second southbound tunnel ferries passengers and freight from France to Britain. The emergency and service tunnel is located between the two main tunnels. It allows for maintenance and service operations to continue without disrupting normal operations on the main rail tunnels (Anguera 2006). Eurotunnel provides transport and vehicle services in the tunnels while Eurostar provides high-speed railway transport systems. All trains in the channel are electrically powered to avoid cases of smoke buildup underground. However, there are a few diesel-powered locomotives to perform maintenance operations or provide emergency transport services when electric power fails (Unmuseum.org, 2015). The Channel Tunnel was officially opened in May of 1994 at a ceremony presided over by both Queen Elizabeth the Second and France's President Mitterand (Smith, 2014). The Channel sees transport services of approximately 500 transport vehicles in a day. The American Society of Civil Engineers labeled the project as one of the wonders of the modern world (Chang & Ive,

More about Channel Tunnel Research Paper

Open Document