Slaughterhouse Industry

2826 Words6 Pages

TABLE OF CONTENTS

Introduction

Industry Study

Project Description

A. Basic Project Information
B. Project Location
C. Project Rationale
D. Alternative
E. Description of Project Phases
F. Baseline Environment Condition
G. Impact Assessment and Mitigation
H. Environment Management Plan
I. Proposal for an Environmental Monitoring and Guarantee Fund

Attachment of Annexes

A. Photos or Plates of Proposed Project
B. Impact Areas, Affected and Communities
C. Maps of the following Scale
D. Permit to Operate Certificate
E. E. Result of Physical and Chemical Analysis of Water and Wastewater

PROJECT DESCRIPTION

Davao City slaughterhouse is located at Ma-a, Davao City. The operations are limited to the night shift. The delivery of animals will start at 1:00 to 4:30 in the afternoon. The whole morning will be utilized for cleaning the area. The 2nd shift will start at 9:00 in the evening up to 5:30 in the morning.

It employs 48 workers of which 25 are regulars and 23 are contractual. This contractual will do the maintenance and the manual slaughtering of animals.

Currently the number of hogs, cattles and other animals slaughtered are as follows

Hogs 200 to 250 heads
Cattle 30 to 40 heads
Chicken none ( chicken slaughterhouse is out of order)
Goat 20 to 25 heads

The number of heads slaughtered everyday does not level of with the number of kilos meat sold in the public market. In short there are hogs and cattle slaughtered privately.

The following are the charges per head for the service rendered:

Hogs P91.11 per head
Cattle&nbs...

... middle of paper ...

...ication Plan

• Organize and conduct information, education and communication ( IEC ) activities on integrated Solid Waste Management Program such as recycling, Re-use, composting, sanitation, proper collection and disposal of solid.

• Properly brief or orient the Project Administrator and beneficiaries about the EEC conditions, commitment and agreements made about the project.

• Support continuing government efforts to promote environmental sound Slaughter House project.

I. Proposal for an Environmental Monitoring and Guarantee Fund

A slaughterhouse of this size requires regular environmental monitoring. To do this, it has to undergo environmental impact assessment to determine whether there is violation of the mitigating measures. To achieve this, a respectable budget should be included in the maintenance and operating cost to answer for many defects that may result to environmental disaster, this budget should be on regular basis to include hiring in contractual basis environmental engineer.