TOWNHOME RENOVATION PROJECT
Objective
In order to enhance and increase the value of my home, renovating and upgrading my town home will increase its value once and if I decide to sell, and provide me with a comfortable place to call home. This statement of work is a narrative description of the work required for upgrading my town home. The selection criterion was based on quality of work, reliability, rapport, and on-time performance. My objective is to keep the cost within my budget to one that I will be comfortable with. Based on research and cost estimates, I will benefit from the company’s work.
The customer, Home Depot, and installers must agree on the following: Understand tasks assigned to her/him and commit to realistic specifications and deadlines. The installers must show up on time and be prepared for work
STATEMENT OF WORK
SCOPE OF WORK
The sub-tasked departments of this project are Home Depot’s carpet installers and kitchen cabinet installers. The Home Depot will provide the following specifications to the customer:
1.1 Specifications
1.1.1. In-home inspections, measurement and pre-construction conference
1.1.2. Site visit by installer to review project with customer
1.1.3. Removal of cabinets, laminate countertops and sink
1.1.4. Install new cabinets, laminate countertops, scribe and corner moldings filler strips, toe kicks, and cabinet hardware
1.1.5. Disconnect and reconnect plumbing and venting to existing service in same location
1.1.6. Replacement of plumbing (trap, shut-off valves and supply tubes within 3” of existing plumbing)
1.1.7. Daily clean-up of job site, bagging debris to curbside
1.1.8. Final inspection with customer
1.1.9. Lifetime warranty on labor
2.1. Rip-up existing carpet & cushion & haul away
2.1.1. Delivery of merchandise
2.1.2. Tack and cushion or glue down carpet
2.1.3. Flat and tap down metal transition
2.1.4. Clean-up of job site and bagging to curbside
2.1.5. ...
... middle of paper ...
...ate from any specification or term of the Specifications, the Supplier shall deliver to the customer an Engineering Change Request (ECR) setting forth:
· Identification of Statement of Work
· The description and justification of the change requested
· An assessment of the impact of the change on the programmatic, costs, functional and performance requirements of the (Work) at any level
BUDGET
Estimated total cost of work to include merchandise and labor = $6881.87.
POINT OF DELIVERY
All documents and material shipped as a result of this Statement of Work shall be sent to the Project Office:
URLINE M. RICHARDSON
4606 Colonel Fenwick Place
Upper Marlboro, MD 20772
CONCLUSION:
This project will be flexible to allow tradeoffs for cost, time, and quality. Upfront coordination and planning will alleviate any tradeoffs but we must always be open to conflicts. Address the work that is required, timeframe needed, and make certain the work that is accomplished is agreeable by all to ensure proper requirements and deadlines will be met.
With that in mind, it is important to understand a couple of concepts before analyzing and determining the effectiveness of that document. Although people do not always realize it, the purchase of a home is one of the b...
Must be flexible and allow changes to make and specify the designs of the projects.
Chicago Housing Authority. Plan for Transformation, Year 3, Moving to Work, Annual Plan FY2002. 16 Oct. 2001.
The team needs to establish a policy and procedure which would be a step toward an organizational structure. This process will be a framework that defines formal reporting relationships between the different levels of management. For example, the guidelines can be used as a protocol of the process managers needs to follow to assist their employees through the change process. The team also needs to provide in house trainings for all departments so employees can be aware and implement the new changes. The training will increase skill level and improve staff productivity.
The Home Depot organization has generated quick growth throughout its operating years. From the first store openings in 1979, the firm has created an exceptional growth pattern, opening their 100th store in 1989 and continuing on into the global market. The company feels that their unique culture and values are what gives them their competitive advantage in the marketplace. Their strengths are in the strong position they have with professional
For this analysis we have chosen Home Depot Incorporated a home improvement retailer. It primary clients are professional “professional remodelers, general contractors, repairmen, small business owners, and tradesmen” (Yahoo Finance, 2015). In addition Home Depot sub contracts installations to third parties (Yahoo Finance, 2015). Home Depot has 2,270 stores in the US and international stores located in Mexico and Canada (Yahoo Finance 2015).
Founded in 1978 by Bernie Marcus and Arthur Blank, The Home Depot is a one stop shop, do-it-yourself home improvement retail store. The first two Home Depot stores opened in Atlanta, Georgia in 1979 as warehouses, each occupying a space of 60,000 square feet (The Home Depot, 2013). When it opened, The Home Depot was the largest hardware store, selling over 25,000 different products and offering various home improvement services (The Home Depot, 2013). From its inception, The Home Depot has provided the best customer service in the industry, as associated guide customers through various facets of home improvement projects. The company is able to provide such service because its associates attend product training, and offers its customers various free home improvement clinics. The Home Depot has transformed the home improvement industry offering the customer its expertise while also providing significant customer savings. ONE TOO MANY SENTENCES!!!
Home Depot is built on the principle of creating value for our stockholders while never forgetting our values. We seek to be profitable, responsible and balance the needs of our communities. Throughout our company, our associates are challenged with finding ways in which we can provide the best products for our customers, provide the best possible work environment for our associates, have a positive impact on the communities in which we operate, and provide excellent returns for our stockholders.
Social/Culture- The social and cultural aspects in the home improvement industry are being looked upon now more than ever with natural disasters becoming more consistent.
The first trip to the hardware store presents a dizzying array of possible items for purchase and leads to a feeling of helplessness of trying to sort out all the choices for pipe repair. Solder, flux, butane torch, and pipe cutter are strange objects that belong in the plumber’s arsenal, rather than the hands of an inexperienced homeowner. Learning to solder and repair copper pipe on the Fourth of July weekend is not supposed to be in the plans, but eight hours of failure that lead to the final Aha!... ... middle of paper ...
Kezner, H. Project Management: A Systems Approach to Planning, Scheduling, and Controlling. 6th. New York: John Wiley and Sons, Inc, 1998. Print.
Our every construction contractor at [cn] is dedicated to delivering satisfaction-guaranteed service. We are composed of individuals who are highly-trained, skilled and experienced in dealing with all issues related to construction work. We'll be with you throughout the construction process offering assistance throughout your entire planning and home building process. Before you move in, we take good care in making sure that even the smallest details are taken into consideration. We guarantee that you will get the best quality home on time and within budget.
When valuing the property, the figures should not be the only issue but also the demographic factors and the services offered. When valuing the property, everything within the property should be assessed. The items inside a house should be valued by the size, the cost and the age of existence, this includes the furniture’s and any other utensils that may be available. For items like the computer, the cost and the make are of importance. The car should also be valued if it forms part of the property and the model and the year of make are of essence. The surrounding of the property should also be put into consideration; the geographical location of the property should be put into consideration (Tucker Sundeep, 2006).
The world is constantly changing in many different ways. Whether it is technological or cultural change is present and inevitable. Organizations are not exempt from change. As a matter of fact, organizations have to change with the world and society in order to be successful. Organizations have to constantly incorporate change in order to have a competitive advantage and satisfy their customers. Organizations use change in order to learn and grow. However, change is not something that can happen in an organization overnight. It has to be thought through and planned. The General Model of Planned Change focuses on what processes are used by the organization to implement change. In the General Model of Planned Change, four steps are used in order to complete the process of change. Entering and Contracting, Diagnosing, Planning and Implementing, and Evaluating and Institutionalizing are the four steps used in order to complete the process of change in an organization. The diagnostic process is one of the most important activities in OD(Cummings, 2009, p. 30).
It is important to have the whole team involved and every team member should about the status of the project and identify there responsibility towards the project success.