Application of control on different points is analysed in the book furthermore talked about in the given slides. The first contrast is, in slides, it gave as professional project manager, and in the book, it noted as project manager, construction manager, and concrete manager. In the given slides, the whole thought isolated into three principles parts i.e. work inputs, tools and techniques and outputs however in the book, it is given as general viewpoints.
As demonstrated in the book, all focuses are analyzed and can interface with the focuses given in the slides under work input of project management plan is like management level reported by the construction manager. Be that as it may, here in the slides minimal more information provided for
…show more content…
Then again, in the book, it is one sort of estimation which is done by the site manager and needs to update the database step by step for reference and further arranging. Here physical progress measurements, field schedule and progress controls, and management level reporting by construction and concrete manager. Each one of these focuses from the book could be connected each other at this point.
Limitations of book approach:
• The book approach fails to provide tools and technique namely expert judgment, analytical techniques, management information system and meetings which are necessary for monitoring and control of project work.
• This book does not likewise give data on environmental factors and controls which are particularly important and assumes an indispensable part for construction firm. Over this, the advantages a subtle element of any organization which ought to screen amid the life cycle of the project is not in any manner said in the book.
• Additionally in the slides, much data is given on dialog of monitoring and controlling process of the project on the groups is a main consideration. As discussed, this involves a method of tracking, reviewing and reporting, which books approach fails to
Examples, of controls are, segregation of duties, assigning parts of the process to different people; preventative controls, separating approvals and payments; detective controls, performing reconciliations – improvement was needed for timely financial reconciliations, corrective controls, around inventory adjustments made to system after physical stock count. Not following procedures when performing reconciliations. While gaps in controls were found the project, team took
In today's business it is in the best interest of companies to have project managers. Common sense isn't always easily accomplished. Anyone who's ever worked on a project in a technical setting knows this. Indeed, much of working with others consists of solving unexpected problems and learning from mistakes along the way. Knowing this and having the proper tools a project manager will be able to manage and complete the most intense project out there.
The concept of building constructing may be impaired without a good knowledge and successful management and impact of the environmental factors influencing the performance of such projects.
The projects in today’s world are given a lot of importance and it will continue to grow in the coming years. There are a lot of companies which do not have production, but all of them do have projects. There are a lot of books which have been published on which related to planning and managing the projects. The one of the most important one was published by the author Eli Goldratt in his book ‘Critical chain’. This book basically talks and shows how the application of theory of constraints in the field of project management. The novel is basically based on one of the MBA classes in America where a number of ideas are developed in discussions among the students and the lecturers. The lecturer is basically fighting for a tenure with the president of the university who expects a downturn in the executive MBA. The lecturer who teaches project management has a word with one the senior colleagues and project management was the right topic to teach. There were three students who were placed in the project management team of their company which manufactures electronic products. The students are enrolled in this MBA class along with other students, here they discover a new approach to project management which is known as the
The whole presentation was about concept of network diagram and beginning to end of project cycle. At the beginning of the presentation he emphasized that as a student studying project management we should understand what network diagram is and have to know how to compress the duration of project down using the diagram. Being closely connected with stakeholders is one of the fundamental virtues of project manager because
Fundamentally, construction projects can be viewed as grouped collections of information and data that require convenient and appropriate storage, organization and distribution to those needing them. Configuration control comes across as a means of signifying changes between the updated and previous version of prints and drawings. In the current paper, I will reflect on the importance of configuration control in a construction project. Configuration control is a critical aspect of a construction project because of the need to organize, store and distribute new information and data correctly and timely to all those who need them.
This project control artifact helps to understand the high level communication management plan, high level quality management plan, high level risk management plan and high level change management plan of the” Project Smile”.
In the globalized economy, Successful project managers are in much demand across many industries. Organizations strongly need experienced project managers to lead their staff to accomplish their business goals and deliver successful projects. In an increasingly complex environment, project managers need to turn into many roles and have all kinds of responsibilities at each level of management within an organization. Good project managers are not born. They need to be trained. They develop their skills through study, practise and experience. They become better project managers after they finish a successful project each time. They learn new techniques and apply them on their projects. They learn their lessons from failed projects and then improve to be better project managers in the future.
Punctuality, the sense of responsibility and the spirit of hard-working are three characteristics which play an essential role in the engineer’s career. In construction site, the quality of many building materials like concrete and mud can change within a short period. If we failed to use them before their self-deterioration punctually, the probability of failure would extremely increases and people would have to live or work in there under a big safety risk and potential financial loss. Also, the sense of responsibility is important. With increasing number of designing institutes have been established, all of engineers are facing a huge competition when participating the project bidding and trying their best so hard to minimize construction cost. Under this condition, we have the responsibility to ensure the quality of the project without being infected by fin...
Management team is the centre of human resource. This project will feature technical service and senior project managers. The management team will oversee the development process of the project. They will ensure the project flow smoothly within the set schedule and budget. The senior management play a strategic role that fuels growth of the mobile application. Thus, the senior management team must comprehensively understand clients’ needs to help realise the project goal (Project-management.com, 2015).
The history of the project management is been very ancient, even before the existence of Gantt chart, history offers serval successful project complete, the Great wall of China, The pyramid, and coliseum each one is good example of project. For each of these project someone should hold to manage hundreds to thousands of worker for many years, and make sure the project in progress in right way and track them and at last the result should be satisfy. Despite of all these great project achieved there are lack in documentation and records throughout the history, most of the earlier project and historical project the documentation are rare. “There are a reasonable rationalization for rare of the document of historical
This paper explores what it takes to be a construction manager and the responsibilities of being a construction manager and the skills that a construction manager should have. It also explores what good construction managers do to have success on their construction projects and the steps that a construction manager must follow to end a project and meet their deadlines at the same
When planning a new project, how the project will be managed is one of the most important factors. The importance of a managers will determine the success of the project. The success of the project will be determined by how well it is managed. Project management is referred to as the discipline that entails the processes of carefully planning, organizing, controlling, and motivating the organization resources so as to foster and facilitate the achievement of specific established and desired goals and meet the specific criteria of success required in the organization (Larson, 2014). Over the course of this paper I will be discussing and analyzing the importance of project management.
By not understanding what the controlling activities will include, the planning process is incomplete. In today’s environment, the relationship between project planning and project control are critical. When a project has an unforeseen event occur, it can be contributed to a planning failure. This is where control comes in to implement the corrective action. This unforeseen event is now a lesson learned and is considered in the planning of future projects. Therefore, project planning and effective project control is an iterative process as depicted below (PMBOK ,
PRINCE2 works with a large portion of the procedures which help for the usage of project management in a win full manner. There are fundamentally three sorts of procedures which are utilized for the advancement of the of project