The Construction Model: Building Information Model In Construction

622 Words2 Pages

Report: Evaluating eqBQ
1 INTRODUCTION
1.1 QUANTITY TAKE-OFF IN CONSTRUCTION
Quantity takeoff is an essential task in the construction process as it provides the basis for other construction tasks that follows. The building elements are measured and these quantities are then used to estimate the cost and the relevant workload involved. This information is then assembled in a Bill of Quantities (BQ). The BQ structures and organizes the information about measurements, productivities and costs, according to the construction task and considers the actual order of the construction process. For example, the foundational elements are under the same section in the BQ while the roof elements are under the same section in the BQ.
Quantity takeoff is applied throughout the whole construction phase. An accurate quantity takeoff is of paramount importance to ensure that the contractor will have enough finances for the project as taking off aims to achieve a thorough analysis of the productivity and of the different types of costs in a particular project.
1.2 WHAT IS BIM?
Building Information Mo...

More about The Construction Model: Building Information Model In Construction

Open Document