Scaffolds Case Study

607 Words2 Pages

• Cover right and left side naves altars, floor altars, station of the cross wood walls 10 ft. high, pews, with plastics and clean drop clothes. • Assemble scaffold, 7 stories high three towers per location; installation, maintenance, the subsequent dismantling and removal of pipe scaffolding along the areas. • We will not be responsible for unauthorized entry into the scaffold nor the results of any such entry. The scaffold may not be altered in any way by anyone without our prior written consent. • Air conditioner units • After the scaffolds are installed we will procedure to install 8 Mitsubishi MSZ-GL12NA-U1 Mini Split Indoor Units, Mitsubishi MSZ-GL15NA-U1. • Two Mitsubishi walls mounted four zone systems 36,000 BTU; these units will be mounted at the rear exterior of the main altar. • …show more content…

• One unit will be installing facing southwest adjacent to the MacDonald building. • Mitsubishi MXZ-4C36NA Mini Split Outdoor. • Condenser(2) Mitsubishi MSZ-GL06NA-U1 Mini Split Indoor Units(1) • Mitsubishi MSZ-GL12NA-U1 Mini Split Indoor Unit(1) Mitsubishi MSZ-GL15NA-U1 • Mini Split Indoor Unit(4) Mitsubishi Handheld Wireless Remote Controllers(10) • Mitsubishi MXZ-4C36NA Mini Split Outdoor Condenser. • Mitsubishi MXZ-4C36NA Mini Split Outdoor Condenser. Page 2 • This product requires the following accessories for installation line Set – • This double insulated tubing transfers refrigerant efficiently between your outdoor condenser and indoor units. • Drain Tubing - Drain tubing facilitates the reliable and effective removal of condensate from your system. It connects your indoor units to drain locations of your

More about Scaffolds Case Study

Open Document